Hungary’s first hybrid geothermal drilling reaches reservoir ahead of schedule
The first state-funded hybrid geothermal drilling in Hungary has reached its target reservoir earlier than expected. Operating at the MVM-KH-01 drilling site, the brand-new, 350-tonne drilling rig struck thermal water at a depth of just 1,940 meters, …